Previous Page  22 / 40 Next Page
Information
Show Menu
Previous Page 22 / 40 Next Page
Page Background

Dedications

(cont.)

Honeycut

Creek Greenway Trail

March 24, 2015

The 5.6-mile Honeycutt Creek Greenway Trail opened on March 24, 2015, providing a link

between the popular Shelley Lake loop trail and the Mountain-to-Sea Trail at Falls Lake.

The trail, which took about two years to complete, connects to the East Fork Mine Creek Trail

at Longstreet Drive. It travels along East Fork Mine Creek through the Summerfield Nor th

neighborhood, crosses Strickland Road, continues through the Bent Tree neighborhood,

moves through a pedestrian tunnel beneath I-540 and reaches the intersection of Honeycutt

and Durant roads. There, it transitions to an unpaved sur face trail along Honeycutt Creek to

Raven Ridge Road.

The $4 million project was funded by the 2003 and 2007 parks bonds.

22

Ra l e i gh Parks, Rec r eaton and Cu ltura l Resour ces