City of Raleigh Development Fee Schedule

20 Right-of-Way Obstructions For reference, the following definitions apply: Full Street: Street Lane: Sidewalk – Full Closure: Sidewalk – Auxiliary (AUX): Sidewalk – Partial Closure: The obstruction of a public street (curb to curb or EOP to EOP) such that no access is provided to the existing street for general vehicular traffic. The obstruction along on-street parking or street travel lane such that limited access is provided to the existing street for general vehicular traffic. The obstruction of a sidewalk such that no access is provided to the existing sidewalk for general pedestrian traffic. The obstruction of a sidewalk such that no access is provided to the existing sidewalk for general pedestrian traffic, but supplementary or alternative means such as cargo containers, scaffolding and temporarily constructed boardwalks/paths are provided to facilitate continued pedestrian movement through or adjacent to the obstructed sidewalk. The obstruction of a sidewalk such that limited, ADA- and PROWAG-compliant access is provided to the existing sidewalk utilizing means such as barricades and traffic cones. In situations where multiple obstructions are requested, and approved, the following fee methodology shall be implemented: • The review fee amount shall be the highest applicable individual review fee amount per request. • The inspection fee amount shall be the highest applicable individual inspection fee amount per obstructed right-of-way frontage. For instances of multiple ob- structed right-of-way frontages, the highest inspection fee amount per frontage shall be applicable. ReviewType Review Fee Daily Inspection Fee Base Adjusted Base Adjusted Full Streets Closure Full Streets - Major - Striped Review $814 $847 $81.00 $84 Full Streets - Major - Non-Striped Review $543 $565 $65.00 $68 Full Streets - Minor - Striped Review $543 $565 $32.00 $33 Full Streets - Minor - Non-Striped Review $271 $282 $21.00 $22 ReviewType Review Fee Daily Inspection Fee Base Adjusted Base Adjusted LANE OBSTRUC- TION Street Lane - Major - Striped Review $407 $423 $32 $33 Street Lane - Major - Non-Striped Review $136 $141 $32 $33 Street Lane - Minor - Striped Review $271 $282 $32 $33 Street Lane - Minor - Non-Striped Review $136 $141 $32 $33

RkJQdWJsaXNoZXIy NjM1NA==