City of Raleigh Development Fee Schedule

26 Street Improvement Fee Item Catch Basins (per side) - per linear foot of street 5 foot Sidewalk (per side) - per linear foot of street 6 foot Sidewalk (per side) - per linear foot of street Multi-purpose path Installation - per linear foot of street 30” Curb and gutter (per side) - per linear foot of street 18”Median curb and gutter (per side) - per linear foot of street Storm drain perpendicular to right-of-way1 – per inch of storm pipe diameter per linear foot of right-of-way width1 Storm drain parallel to right-of-way – per linear foot of street Clearing and grubbing – per acre Common excavation – per cubic yard Rock excavation – per cubic yard Seeding and mulching – per acre Traffic control (both sides of existing streets) – per linear foot Erosion control – per linear foot Paint striping – per linear foot Guardrail – per linear foot RetainingWall Installation ** Keystone brick – per square foot Pour-in-place – per cubic yard Traffic signal upgrade – wood pole to metal pole - per pole Traffic signal relocation – per corner Fire hydrant relocation – each Water meter relocation – each Utility pole relocation – each Backflow and vault relocation – each Paving ** Asphalt (Surface Layer) per square yard-inch Asphalt (Binder Layer) per square yard-inch Asphalt (Base Layer) per square yard-inch Paving stone (ABC) per square yard-inch Mobilization 4% of construction costs Design & inspection 15% of all project costs except right-of-way and slope easements VI. Reimbursement Schedule $17.11 $14.25 $17.10 $9.88 $12.45 $9.41 $2.02 $7.98 $10,170.70 $12.45 $60.98 $1,725.39 $14.72 $6.42 $3.66 $27.32 $19.48 $583.74 $15,398.91 $4,719.06 $1,794.02 $541.44 $6,488.32 $5,190.65 $2.24 $2.31 $2.41 $0.55

RkJQdWJsaXNoZXIy NjM1NA==