City of Raleigh Development Fee Schedule

31 Hydrant Deposit Per Day Per Month Per Year Consumption Rate (per CCF) Hydrant Meter Rental Fees Per 1,000 gallons Septage Disposal Fee Water design Sewer design Sewer pump station design Water/Sewer Plan Review - Permit Application Fees Ordinance No. 2017-683 (Section 8-2040) Base fee Projects >2,000 lineal feet, add additional per foot (per foot) Sewer pump station inspection (per pump station) Ordinance No. 2017-682 (Section 8-2077) Water and Sewer Minor Mains Reimbursement Schedule Sewer Main Extension TV Inspection Item Reimbursement Cost (per linear ft) Water Mains 6-inch $40 8-inch $48 Sewer Mains 8-inch $52 10-inch $68 Design & Inspection 10% of construction cost $500 $10 $280 $1,500 $6.58 $65 $200 $200 $300 $416 $0.28 $1,400