City of Raleigh Development Fee Schedule

32 Water and Sewer Major Mains Reimbursement Schedule Item Construction Cost (per linear ft) Reimbursement Cost (per linear ft) Water Mains 6-inch $40 $0 8-inch $70 $30 16-inch $86 $45 24-inch $158 $117 Sewer Mains 8-inch $52 $0 12-inch $78 $27 15-inch $90 $38 18-inch $115 $61 24-inch $171 $120 Bore 12-inch $194 $0 16-inch $228 $34 20-inch $232 $38 24-inch $251 $54 36-inch $307 $113 Design & Inspection 10% of construction cost Fee Schedule Ord No. 2017-687 (Section 8-2094)