Unified Development Ordinance, 4th supplement, September 2017

Part 10A: Unified Development Ordinance City of Raleigh, North Carolina 10 – 29 Effective Date: September 01, 2013 Supp. No. 4 Article 10.2. Review Procedures | CHAPTER 10. ADMINISTRATION Sec. 10.2.5. ​​Subdivision Review of Raleigh, but are irrevocably made to the subsequent owners of any and all properties shown hereon for their use and benefit. viii.Delineations of watercourse buffers and impervious surface area limitations for properties located in a -UWPOD, -FWPOD, -SWPOD, -MPOD or CM District. ix. Signature of an official from the North Carolina Department of Transportation if public street right-of-way is involved for lands located outside the City limits. x. Stormwater control facilities, including without limitation, detention facilities, retention facilities, wet ponds, sand filters, wetlands, bio-retention measures, swales and storm pipes required by Article 9.2. Stormwater Management , permanently protected undisturbed open space areas, together with showing the means of transporting stormwater runoff to and from any nitrogen reduction and stormwater runoff control measures or facilities. xi. A statement on the plat which lots, by number, are served by which stormwater control facility; the stormwater control facility shall be indicated by type and by its general location. xii. A notation that the dedicators and their successors waive their statutory rights to withdraw dedications of the right-of-way when the public has made reimbursement for the right-of-way or when density has been transferred from the right-of-way. d. The applicant shall submit all information, maps and data required by the Planning and Development Officer to properly review the final subdivision plat for conformity with all City ordinances, standards and regulations. For example, building envelopes may be required to show the development potential of any lot and if the lot can not be reasonably developed in accordance with Article 8.3. Blocks, Lots, Access , the lot shall not be recorded notwithstanding any prior preliminary subdivision plan approval of the lot. 3. Planning and Development Officer Action a. After an application has been determined complete, Planning and Development shall review the final subdivision plat for compliance with the approved preliminary subdivision plan and conditions of approval. b. In reviewing the final subdivision plat, Planning and Development shall consult with the Public Utilities, PublicWorks, Parks and Recreation and Fire Departments. c. Upon completion of the review, the Planning and Development Officer may meet with the applicant to discuss any changes in development design. d. If the final subdivision plat contains the dedication of streets and public easements, the construction of development-related improvements or the establishment of private drainage easements, then Planning and Development shall forward copies of the final subdivision plat to the appropriate City departments for review. e. Planning and Development shall complete the review of the final subdivision plat and notify the applicant of nonconformities, omissions or required corrections. If the final subdivision plat is disapproved, the reasons for such disapproval shall be stated in writing, specifying the provisions of the UDO with which the final subdivision plat does not comply. A revised final subdivision plat may be submitted to Planning and Development for further consideration. f. Within 20 days after the date of the decision on a final subdivision plat, an appeal of the Planning and Development Officer's action may be filed with the Board of Adjustment as set forth in Sec. 10.2.11. . g. Planning and Development shall approve the final subdivision plat if it conforms with the approved preliminary subdivision plan and conditions of approval, N.C. Gen.Stat. §30-47 and the content requirements for the plat and recorded map checklist. h. No final subdivision plat shall be approved until all required public improvements are accepted for public maintenance and completely installed or a construction security is posted with the City as set forth in Sec. 8.1.3. 4. Action Following Final Approval of the Plat a. After a final subdivision plat is approved, the Planning and Development Officer shall certify the plat for recording after the required signatures for recordation have been provided.

RkJQdWJsaXNoZXIy NjM1NA==