SECTION 5:
FUTURE STRATEGIES PRIORITIZATION
29
5.4
Results of the Strategies Prioritization through the
Decision Analysis Framework
The consulting team applied its multi-criteria analysis prioritization model to support the
development of the prioritized strategy list. Utilizing the decision criteria, criteria weights,
and performance scale scorings by each Teammember, the prioritization model produced
the total benefit ranking, based on the cumulative criteria score, for the 34 strategies as
shown in Exhibit 9. These results are arranged in the order of highest to lowest priority
strategies.
The prioritization model calculated a cumulative criteria score for each candidate strategy,
determined from the combination of the performance scale scores and the decision criteria
weighting. The cumulative criteria scores are presented on a ‘100’ point scale, a score of
‘100’
points represents the most complete benefit that a candidate strategy could provide to
meet the CEAP goals that represented by the decision criteria.
EXHIBIT 9
Prioritized 34 Future Carbon Reduction Strategies
No.
Strategy
ID
Strategy Name
1
EE-1-11
City Building Climate Controls
2
FLT-1-29
Consolidate Collection of Recyclables & Outdoor Solid Waste from City Parks
3
EE-1-53
City Building Envelope Improvements
4
EE-1-72
Raleigh Convention Center Preventative Maintenance Plan Implementation
5
EE-1-35
City Building Interior Light Controls
6
EE-1-63
Pre-Heat Water for City Pools by Solar Thermal
7
CR-1-02
Increase Recycle Container Size
8
FLT-1-10
Increase City Fleet Alternative Fuel Vehicles
9
EE-1-36
Utilize LED Lighting in City Parking Decks
10
CR-1-32
Continue Water Efficiency
11
CR-1-28
Water Distribution System Real Time Energy Mgmt. Optimization (RTEMOO)
12
EE-1-33
Utilize LED Lighting for City Street Lighting
13
EE-1-32
Replace Lighting at Public Utilities Dept. Facilities
14
CR-1-13
Utilize Alternative Chemicals in Wastewater Treatment Process
15
EE-1-21
LEED Policy Emphasis on Energy Efficiency
16
EE-1-52
Energy-Efficient Vending Machines
17
CR-1-08
Tree Planting Programs
18
EE-1-12
Elevator/Fan Light Controls and Lighting Conversion to LED