EE‐1‐11 Building Climate Controls (Technology Interface)
Load‐shedding/demand‐response algorithms using building automation infrastructure 
and Periscope (energy management software). Smart Buildings; building‐wide 
thermostats with motion sensors and smart schedulers
EE‐1‐12 Elevator Fan/Light Controls & LED Conversion
Elevator controllers to reduce energy usage when not in use; convert lighting to LED
EE‐1‐21 LEED Policy Emphasis on Energy Efficiency 
Policy for LEED to concentrate points for energy efficiency 
EE‐1‐32 Replace Lighting in PUD Facilities
Lighting replacement in PUD operating facilities (Induction lighting, CFL, motion‐
detection)
EE‐1‐33 Utilize LED Lighting for City Street Lighting
Replace all street lights with LEDs 
EE‐1‐35 Building Interior Light Controls
Control based on ambient light level and motion detection
EE‐1‐36 Utilize LED Lighting in Parking Decks
Install LED lights in all City parking decks 
EE‐1‐52 Energy‐Efficient Vending Machines
Procure energy‐efficient vending machines; Update contract terms for vending machines 
to require Energy Star rating
EE‐1‐53 Building Envelope Improvements
Building weather‐proofing, glazing improvements, etc.
EE‐1‐63 Pre‐heat Water for City Pools by Solar Thermal
Preheat pool water at aquatic centers by solar 
EE‐1‐72
Raleigh Convention Center Preventative 
Maintenance Plan Implementation
Implement CIP preventative maintenance plan for Convention Center
Added During
Project Scoring
CIP for Energy Efficiency City‐wide
Develop CIP preventative maintenance plans City‐wide
Top Future Strategies ‐ Buildings Team
CITY OF RALEIGH OPERATIONS ‐ TOP FUTURE CEAP STRATEGIES 
City of Raleigh Operations Climate/Energy Action Plan
Top Future Strategies
CH2M HILL
Page 1 of 20