CITY OF RALEIGH OPERATIONS ‐ OTHER FUTURE STRATEGIES FOR CLIMATE/ENERGY ACTION PLAN
CR‐1‐20
Biosolids Solar Drying at 
Neuse River WWTP
Evaluate use of solar for drying biosolids and residuals; will decrease volume to be hauled; 
team determined 
this is a Scope 3 item and therefore not part of this analysis
CR‐1‐21
Equalization at Neuse River 
WWTP
Use existing 32 million gallon equalization basin at Neuse River WWTP to store WW and then pump and treat 
during off‐peak hours;
not feasible due to US Army COE issues with regulation of downstream flows
CR‐1‐23
Increase WW Pump Station 
Wet Well Capacities
Increase WW PS wet well capacity to reduce pumping; 
team determined not feasible as can create large 
operational problems
Non‐Feasible Future Strategies as Determined by Teams
City of Raleigh Climate/Energy Action Plan
Other Future Strategies
CH2M HILL
Page 20 of 20