Lower Longview Stream Bank Repair

Last updated Aug. 23, 2017 - 2:36 pm
  • Planning
  • Design
  • Construction
  • Completed
  • Stream Restoration
  • $220,000
  • Stormwater Management (Lead)
  • Brown and Caldwell

Current Activity

The design plans for this stream bank repair project are currently under review by the City's Development Services Department. Following plan review, the environmental permitting process will take place.

Summary

The primary goal of this project is to repair areas of the stream running alongside Longview Lake Drive that is eroded. About 400 feet of the stream is affected starting at New Bern Avenue. To stabilize the stream, the repair will include:

  • Vegetative stabilization of lowered slopes above the normal flow line of the creek;
  • Extending an existing stormwater pipe that goes to the creek in order to prevent erosion in the future; and
  • Protecting the outfall of the stream.

Schedule

Project schedule with dates and descriptions
DateDescription
Spring 2017Project design completed
Fall 2017Project construction begins
Winter 2018Project construction complete

History

This project is associated with additional efforts to restore Lower Longview Lake Dam.