Permits Issued Through the Online Development Center
Process Description: e-Permits is a web based application on the Online Development Center designed for contractors to apply, pay for and print electrical, mechanical and/or plumbing permits on-line for minor alterations and repairs that are in no way associated with a project that also requires a building permit. Clients may obtain one permit or all three; however, if your project requires a trade permit in addition to either an electrical, mechanical and/or plumbing permit, clients are asked to not use the e-permits tool but rather obtain a complete permit package by visiting the Development Services Customer Service Center located at One Exchange Plaza, Suite 404, Raleigh, NC. The e-Permits tool is intended for stand alone permit types and not for building projects (i.e. additions or completing unfinished basements/attics). If your project requires a complete permit package, please consider using other permitting services offered by the Development Services Customer Service Center.
What types of projects are allowed? Residential, Group Housing (apartments) or Commercial permits may be issued to do the following:
Repair or Replace underground water or sewer service
Fixtures and water heaters may be replaced in all occupancies
One additional fixture may be added to an existing plumbing system for a Single Family Dwelling, Townhome or Duplex
Repair or Replace electrical service
Install temporary electrical boards
Change a water heater fuel source or add a flue for an existing HVAC system
New electrical circuit or fuel piping for a Single Family Dwelling, Townhome or Duplex. Please note that adding a circuit is not finishing a new room
Installing a new appliance, deck receptacle, light, smoke detector, or new fan
New circuit in the garage or A/C window unit
Minor electrical repairs are limited to a single circuit
Contractor may add a Rough-In inspection but the card will only show a Final inspection. This will allow for a hook up of a new appliance, disposal, dishwasher, extra sink or washer/dryer connection
What types of projects are NOT allowed? Any project that also requires a Building Permit may not use the e-Permit system to process permits such as:
Any project that requires a plan review (i.e. Hood system, Fire system, finishing a bathroom, etc.)
Finishing a room that requires a building permit
Installation (circuit) of a pool or hot tub that also requires a building permit
Install an A/C system in an existing house that did not have A/C previously; Also may not install a new HVAC system with an e-Permit (permitting is charged per square foot)
Irrigation system installation
What will happen if the e-Permits system is misused to process permits? When a permit is inappropriately processed using the e-Permits system, it causes Level I inspectors to be dispatched instead of a Level III inspector, which is legally required for certain types of jobs. If a contractor uses the e-permit system inappropriately to process permits, they can expect the following:
Contractor will be contacted and advised of the misuse
Inspection will not be rejected
Contractor will be required to purchase a new permit in person at the Customer Service Center located at One Exchange Plaza Suite 400 on Fayetteville Street Raleigh NC
The City of Raleigh will void the original e-permit as invalid
Are there any prerequisites/requirements to this process?
Internet connection, Internet Explorer 6.0 or higher
City of Raleigh authorized user id and password; Contact the Development Services Customer Service Center at (919) 516-2495 for information needed to access the application for the first time (see specific contact information at bottom of this page for this specific task)
Contractor information (contractor license, contact information, business license, workman’s comp, liability insurance, etc.) must be complete, current and valid in the City of Raleigh Contractor file. Contact the Development Services Customer Service Center at (919) 516-2495 to confirm the accuracy of all required data
What do I need to submit to the City? Contractors do not need to submit any paperwork to the City of Raleigh. The permit application is completed and submitted online.
Where can I find detailed information regarding submittals?
If project requires a building permit in addition to either the electrical, mechanical or plumbing permit, do not use the e-Permit tool. Client should contact the Development Services Customer Service Center to process a complete permit package to prevent complications during the field inspection process
Each permit is $72 (minimum fee permits) and payment is made on line using a Visa or Master Card
How long will this process take? One (1) permit takes approximately five (5) minutes. It will take less time as contractor becomes more familiar with the on-line application.
For More Information Contact:
Cornelia Stallings
Walk Thru Permitting
City Manager Department
One Exchange Plaza Suite 400
Raleigh, NC 27601
919-516-2517
Vicky Gibson
Walk Thru Permitting
City Manager Department
One Exchange Plaza Suite 400
Raleigh, NC 27601
919-516-2721