City of Raleigh Development Fee Schedule

26 Street Improvement Fee Item Catch Basins (per side) - per linear foot of street 5 foot Sidewalk (per side) - per linear foot of street 6 foot Sidewalk (per side) - per linear foot of street Multi-purpose path Installation - per linear foot of street 30” Curb and gutter (per side) - per linear foot of street 18”Median curb and gutter (per side) - per linear foot of street Storm drain perpendicular to right-of-way1 – per inch of storm pipe diameter per linear foot of right-of-way width1 Storm drain parallel to right-of-way – per linear foot of street Clearing and grubbing – per acre Common excavation – per cubic yard Rock excavation – per cubic yard Seeding and mulching – per acre Traffic control (both sides of existing streets) – per linear foot Erosion control – per linear foot Paint striping – per linear foot Guardrail – per linear foot RetainingWall Installation Keystone brick – per square foot Pour-in-place – per cubic yard Traffic signal upgrade – wood pole to metal pole - per pole Traffic signal relocation – per corner Fire hydrant relocation – each Water meter relocation – each Utility pole relocation – each Backflow and vault relocation – each Paving Asphalt (Surface Layer) per square yard-inch Asphalt (Binder Layer) per square yard-inch Asphalt (Base Layer) per square yard-inch Paving stone (ABC) per square yard-inch Mobilization 4% of construction costs Design & inspection 15% of all project costs except right-of-way and slope easements VI. Reimbursement Schedule $17.78 $14.80 $17.76 $10.26 $12.93 $9.77 $2.09 $8.28 $10,563.28 $12.93 $63.34 $1,791.99 $15.29 $6.66 $3.80 $28.38 $20.23 $606.27 $15,993.31 $4,901.22 $1,863.27 $562.34 $6,738.77 $5,391.01 $2.33 $2.40 $2.50 $0.57

RkJQdWJsaXNoZXIy NjM1NA==