City of Raleigh Development Fee Schedule

City of Raleigh Development Fee Schedule

32 Water and Sewer Major Mains Reimbursement Schedule Item Construction Cost (per linear ft) Reimbursement Cost (per linear ft) Water Mains 6-inch $42 $0 12-inch $73 $31 16-inch $89 $47 24-inch $164 $122 Sewer Mains 8-inch $54 $0 12-inch $81 $28 15-inch $93 $39 18-inch $119 $63 24-inch $178 $125 Bore 12-inch $201 $0 16-inch $237 $35 20-inch $241 $39 24-inch $261 $56 36-inch $319 $117 Design & Inspection 10% of construction cost Fee Schedule Ord No. 2018-843 (Section 8-2094(c))

RkJQdWJsaXNoZXIy NjM1NA==