Unified Development Ordinance, 6th supplement, September, 2018

Part 10A: Unified Development Ordinance City of Raleigh, North Carolina 9 – 48 .1 Effective Date: March 6, 2018 Supp. No. 5 by utilizing the loading calculation method prescribed in the Stormwater Control andWatercourse Buffer Manual. iii. Developments that comply with the watershed stormwater control master plan approved for its watershed protection area are exempted from the requirements of this section. Compliance with watershed stormwater control master plan must include: a) The installation within the development of all stormwater control measures shown on the watershed stormwater control master plan; b) The payment of fees in lieu of installation, when allowed by the State; and c) The payment of any applicable drainage fees if the facilities prescribed by the master plan are constructed. Article 9.5. Watershed Protection Areas | CHAPTER 9. ​NATURAL RESOURCE PROTECTION Sec. 9.5.3. Swift Creek Watershed Protection Overlay District (-SWPOD)

RkJQdWJsaXNoZXIy NjM1NA==