Blue Ridge Road Widening Project

Last updated Feb. 26, 2018 - 4:26 pm
  • Planning
  • Design
  • Construction
  • Completed
  • Road Widening
  • 12,000,000
  • Roadway Design and Construction (Lead)
  • Kimley Horn (Design Consultant)

Current Activity

Posted Monday, Feb. 26

The project is in the early design phase. The design consultant (Kimley Horn) is completing surveys and collecting data along the corridor. A project schedule will be posted once the surveys are completed.


The project will widen a segment of Blue Ridge Road from Duraleigh Road to Crabtree Valley Avenue to three lanes with;

  • Curb and gutter
  • Sidewalks on both sides of the roadway; and,
  • Bicycle lanes.


The Blue Ridge Road Widening Project was prioritized in the Capital Improvement Program, as a major street project.