Structure 98 Surface Replacement

Last updated Oct. 26, 2017 - 3:31 pm
  • Planning
  • Design
  • Construction
  • Completed
  • Parks, Recreation and Cultural Resources (Lead)
  • Dewberry Engineers Inc

Current Activity

Dewberry Engineers Inc has been hired to develop a design for the replacement of the decking on Structure 98. Dewberry is currently working on developing this design.

Summary

Structure 98 is a pedestrian bridge on the Neuse River Greenway Trail, just south of Crag Burn Lane. Over the years, with constant exposure to the elements, the decking on this structure has become aged and uneven, resulting in citizen’s complaining about the “bumpiness” of the bridge. To address this issue, the City of Raleigh Parks, Recreation, and Cultural Resources Department is working on a design to replace the decking.

Schedule

Project schedule with dates and descriptions
DateDescription
On-GoingDesign
Winter 2018 Construction Begins
Spring 2018 Construction Complete

History

The Capital Area Greenway System was first adopted by City Council in 1976. This plan proposed a system of linear parks located primarily along rivers, streams, and creeks, and included the opportunity for an interconnected system of pedestrian trails across the region.