Current Sidewalk Projects

Raleigh Sidewalk Improvement Projects

Last updated Sep. 11, 2019 - 3:09 pm

City-initiated Projects are generally focused on fixing gaps along higher volume streets, such as thoroughfares. Each proposed sidewalk project is evaluated and ranked based on a variety of factors, including street classification, existing demand, special population needs, feasibility, and the proximity of places people want to walk to, like parks, schools, and shopping areas.

Blue Ridge Road Sidewalk Project

The project is to install a sidewalk along the west side of Blue Ridge Road between Pylon Drive and Faber Drive.

Project Status: Design Phase
Project Completed:
Late fall 2019
Funding - City Bond

Project Engineer – Amy Billings, PE

Blue Ridge Road Bike and Pedestrian Project

The City is making sidewalk and bike lane improvements to Blue Ridge Road from Trinity Road to just north of Reedy Creek Road.

Project Status: Design Phase
Project Completed: Schedule pending
Funding - Federal and Capital Funding

Project Engineer – Beth Quinn. PE

View Project Details

Capital Boulevard Sidewalks (North of I-440 interchange)

The addition of sidewalk on both sides of Capital Boulevard from I-440 Ramps to Brentwood Road.

Project Status: Design Phase
Projected Completion:
Spring 2021
Funding - City Bond

Project Engineer - Reuben Moore, PE
Design Consultant: Stewart Engineering, Inc.

Public Meeting Project Map

Project Location

Centennial Parkway Sidewalk Project

The City will install a sidewalk along the south side of Centennial Parkway from Avent Ferry Road to Nazareth Street.

Project Status: Design Phase
Project Completed: Late spring 2020
Funding - City Bond

Project Engineer – Beth Quinn, PE

Gorman Street Connector Project

The City will improve bicycle and pedestrian connectivity on Gorman Street between the Rocky Branch Trail at Ligon Street/Sullivan Drive and the Reedy Creek Trail at Hillsborough Street/Clark Avenue.

Project Status: Design Phase
Project Complete: Late fall 2020
Funding - Federal and Capital Funding

Project Engineer – Chad Cantrell, PE

View Project Details

Green Road

Completion of gaps in sidewalk along both sides of the road from New Hope Church Rd to Spring Forest Rd.

Project Status: Final Design and Right of Way Acquisition Phase
Projected Completion: Winter 2021
Funding - City Bond

Project Engineer - Sean Driskill, PE

Public Meeting Map

Project Location

Holston Lane Sidewalk Project

The Project will install a sidewalk along the north side of Holston Lane between Sunnybrook Road and Calumet Drive.

Project Status: Design Phase
Project Completed: Late spring 2020
Funding - City Bond

Project Engineer – Grady McCollum, PE

Preliminary Plan Map

Ileagnes Road Sidewalk Project

The City will install a sidewalk along the south side of Ileagnes Road between Cherry Circle and South Saunders Street.

Project Status: Design Phase
Project Completed: Late spring 2020
Funding - City Bond

Project Engineer – Grady McCollum, PE

Preliminary Plan Map

Lake Boone Trail Sidewalk Project

We are installing about 350 ft. of sidewalk on the south side of Lake Boone Trail. The new sidewalk will start at Blue Ridge Road and runs to the entrance of Rex Woods Office Center. The project will fill in one of the last remaining gaps on Lake Boone Trail, providing consistent pedestrian access.

We will also upgrade all the sidewalk ramps at the intersection of Blue Ridge Road and Lake Boone Trail. New pavement markings at this intersection will also provide high-visibility crosswalks.

Project Status: Design Phase
Project Completed: Late spring 2020
Funding - City Bond

Project Engineer – Sean Driskill, PE

Lake Wheeler Road (Centennial to Maywood)

Installation of a sidewalk on the east side of Lake Wheeler Road from Maywood Avenue to Centennial Parkway.

Project Status: Design Phase
Projected Completion:
Spring 2021
Funding - City Bond

Project Engineer - Reuben Moore, PE
Design Consultant: Stewart Engineering, Inc.

Project Location

Leesville Road Safe Route to School project

The Leesville Road Safe Routes to Schools (SRTS) project will install new sidewalks and bicycle accommodations along O'Neal Drive, Pride Way, Country Trail, and on the school property.

Project Status: Design Phase
Project Completed: Late fall 2020
Funding - Federal and Capital Funding

Project Engineer – Chad Cantrell, PE

View Project Details

Louisburg Road (US 401) Sidewalk project

The City will install a sidewalk along the west side of Louisburg Road between Beacon Street and Fox Road.

Project Status: Design Phase
Project Completed: Fall 2020
Funding - City Bond

Project Engineer – Chad Cantrell, PE

Lumley Road and Westgate Road Project, Northwest Raleigh Bicycle Corridor Project

Installation of bicycle and pedestrian upgrades along Lumley Road at the intersection of Brier Creek Parkway, and terminates near Umstead State Park at the Ebenezer Church Road / Graylyn Road entrance (one route terminates at Leesville Road).

Project Status: Design Stage
Project Completion: Winter 2022
Funding - City Bond

Project Engineer - Reuben Moore, PE
Project Consultant
– Stewart Engineering

View Project Details

Project Location

Maywood Avenue

Installation of a sidewalk on the north side of Maywood Avenue from South Saunders Street to Summit Avenue and installation of sidewalk on the south side of Maywood Avenue from South Saunders Street to Lake Wheeler Road.

Project Status: Design Phase
Projected Completion:
Spring 2021
Funding - City Bond

Project Engineer - Reuben Moore, PE
Design Consultant: Stewart Engineering, Inc.

Public Meeting Project Map

Project Location

East Millbrook Road Sidewalk

Installation of a sidewalk along the north side of East Millbrook Road from Atlantic Avenue to Capital Boulevard.

Project Status: Final Design and Right of Way Acquisition Phase
Projected Completion:
Late fall 2020
Funding - City Bond

Project Engineer - Reuben Moore, PE
Design Consultant: ARCADIS

Millbrook Road and New Hope Road Public Meeting Map

Project Location

The City will install a sidewalk on Navaho Drive between Executive Drive and Bush Street as part of the GoRaleigh Passenger Amenity Program.

Project status: Design Phase
Project Completed: Spring 2020
Funding - Federal and Capital Funding

Project Engineer - Grady McCollum, PE

New Bern Avenue Pedestrian Improvements

The project consists of streetscape improvements on both sides of the New Bern Avenue from Tarboro Road to Sunnybrook Road.

Project Status: Design Phase
Projected Completion:
Summer 2020
Funding - Federal & Capital Funding

Project Engineer - Sean Driskill, PE
Design Consultant
Kimley Horn and Associates

View Project Details

Project Location

New Hope Road Sidewalks

Installation of sidewalks on both sides of the street on New Hope Road from Capital Boulevard to Wallingford Drive.

Project Status: Design Phase
Projected Completion:
Late fall 2020
Funding - City Bond

Project Engineer - Reuben Moore, PE
Design Consultant: ARCADIS

Millbrook Road and New Hope Road Public Meeting Map

Project Location

Peace Street West Steetscape

Installation of new sidewalks and street trees along both sides of the Peace Street corridor between St. Mary's Street and West Street.

Project Status: Design Phase
Projected Completion: Fall 2021
Funding – Capital Funding

Project Engineer - Amy Billings, PE
Design Consultant - Cole, Jenest, & Stone

View Project Details

Project Location

Poole Road

New sidewalk on the north side of the road between Donald Ross Drive and Sunnybrook Road.

Project Status: Construction
Projected Completion: Summer 2019
Funding - City Bond

Project Engineer: Grady McCollum, PE

Public Meeting Handout and Map

Project Location

Raleigh Boulevard Sidewalk Project

The project will install sidewalk along the east side of Raleigh Boulevard between Martin Luther King Boulevard and Poole Road.

Project Status: Design Phase
Project Completed: Late spring 2020
Funding - City Bond

Project Engineer - Beth Quinn, PE

Rock Quarry Road

New sidewalk on the east side of Rock Quarry Road between Bart Street and Martin Luther King Jr. Boulevard and new sidewalk on the north side of Blazing Star Lane from Rock Quarry Road / Raleigh Boulevard to Nightshade Way.

Project Status: Construction
Projected Completion: Summer 2019
Funding - City Bond

Project Engineer: Grady McCollum

Project Location

Spring Forest Road Sidewalks

Installation of sidewalks along both sides of the street on Spring Forest Road from McHines Place to Capital Boulevard.

Project Status: Design Phase
Projected Completion:
Spring 2021

Project Engineer - Reuben Moore, PE
Design Consultant: ARCADIS

Spring Forest Road Public Meeting Map

Project Location

Wade Avenue Sidewalk

Installation of sidewalk along the north side of Wade Avenue from Hobson Court to Oberlin Road and the south side of Wade Avenue from Oberlin Road to east of Daniels Street.

Project Status: Design Phase
Projected Completion:
Spring 2021
Funding - City Bond

Project Engineer - Reuben Moore, PE
Design Consultant: Stewart Engineering, Inc.

Public Meeting Project Map

Project Location

Wake Forest Road Sidewalks

Installation of sidewalk along the east side of Wake Forest Road from Hodges Street to Georgetown Road.

Project Status: Design Phase
Projected Completion:
Spring 2021
Funding - City Bond

Project Engineer - Reuben Moore, PE
Design Consultant: Stewart Engineering, Inc.

Public Meeting Project Map


Project Location

Petition Projects are projects on local residential streets that are handled through the Sidewalk Petition Program. The petition program for a new sidewalk requires signatures from a majority of the property owners along the street that make up the majority of the property frontage. In most cases there are no costs for residential property owners.

Barksdale Drive

Installation of a 6-foot wide sidewalk placed 3.5 feet from the back of curb on the North side of the street from Timber Drive to Mossbank Road, then from Mossbank Road to N. Raleigh Blvd. construct a 6-foot sidewalk directly behind the curb on both sides of the street.

Project Status: Design
Project Completion: Late fall 2020
Project Engineer: Brennon Fuqua, PE

Daisy Street

Installation of a 5-foot wide sidewalk placed 2.5 feet from the back of curb on the west side of the street from Hillsborough Street to Clark Avenue. Adjustments to the sidewalk width and setback may be included in the final design to avoid major impacts in certain areas as needed and determined by our engineering staff.

Project Status: Design Phase
Project Completion:
Spring 2020
Project Engineer – Cordis Yates-Thompson

Project Location

Featherstone Drive Sidewalk Project

The Featherstone Drive Sidewalk project is the product of a successful sidewalk petition the City received in the Summer of 2018.

Featherstone Drive will have a new sidewalk installed on the north side of the street from Six Forks Road to Mourning Dove Road.

Project status: Design
Project Completion:
Winter 2021
Project Engineer: Cordis Yates-Thompson

Petition Documents
Petition Results Presentation

Fiesta Way Sidewalk Project

The Fiesta Way Sidewalk Project is the product of a successful sidewalk petition that the City received in the Summer of 2018.

The project will install a sidewalk on Fiesta Way from Fall of the Neuse Road to the existing sidewalk on Fiesta Way.

Project status: Design
Project Completion: Winter 2021
Project Engineer: Cordis Yates-Thompson

Petition Documents
Petition Results Presentation

Inglewood Drive Sidewalk Project

The Inglewood Drive Sidewalk Project was initiated as a City of Raleigh Sidewalk Petition.

With this project we will install a 5-foot wide sidewalk set back 3.5 feet from the back of the curb from Yadkin Drive to Manchester Drive.

There may be adjustments to the sidewalk to avoid major impacts in certain areas as needed and determined by our engineering staff.

Project Status: Design Phase
Project Completion: Schedule is pending
Project Manager: Cordis Yates-Thompson

Petition Documents
Petition Presentation

Old Deer Trail

The Old Deer Trail sidewalk project was initiated as a City of Raleigh Sidewalk Petition.

We will install a 5-foot sidewalk placed 3.5 feet from the back of the curb from Mourning Dove Road to just north of Apple Orchard Way.

There may be adjustments to the sidewalk to avoid major impacts in certain areas as needed and determined by our engineering staff.

Project Status: Design Phase
Project Completion: Fall 2020
Project Manager – Cordis Yates-Thompson

Petition Documents

Plainview Avenue

Installation of a 6-foot-wide sidewalk setback 3.5 feet from the curb on the west side of the street, and from Vale Street to just south of the creek construct a 6-foot sidewalk with a 3.5-foot setback along the south side of the street.

Project Status: Design
Project Completion:
Winter 2021
Project Engineer: Brennon Fuqua, PE

Valley Drive Sidewalk Project

The Valley Drive Sidewalk Project was the product of two successful City of Raleigh Sidewalk Petitions. One was received in the summer of 2018 and the other was received in the winter of 2019. The City has decided to complete the two petitions as one project.

The project will install a sidewalk along the east side of the street between Sawmill Road and Lynn Road.

There may be adjustments to the sidewalk to avoid major impacts in certain areas as needed and determined by our engineering staff.

Project status: Design
Project Completion: Winter 2021
Project Engineer: Cordis Yates-Thompson

Petition Documents Summer 2018
Petition Results Presentation 2018
Petition Documents Winter 2019
Petition Presentation 2019

Winthrop Drive

Installation of a 6-foot-wide sidewalk on a 2.5 foot setback from the curb on the East side of the street from West Millbrook Road to Sleepy Hollow Drive.

Project Status: Design
Project Completion: Late fall 2020
Project Engineer: Cordis Yates-Thompson

Whittier Drive

The Whittier Drive Sidewalk Project is the product of a successful Sidewalk Petition that the City received in the Fall of 2018.

The project will install a sidewalk along the east side of the street between Killington Drive and Optimist Park pool entrance.

Project Status: Design
Project Completion: Schedule is pending
Project Engineer: Cordis Yates-Thompson

Petition Documents
Petition Results Presentation

Yadkin Drive Part C

Installation of a variable width sidewalk with a variable width setback from the curb on the southeast side of Yadkin Drive from Alleghany Drive to Staley Court transitioning to a 6-foot wide sidewalk on a 3.5-foot setback from the curb on the southeast side from Staley Court to Currituck Drive.
The variable sidewalk width and setback from Alleghany Drive to Staley Court are needed to allow a match and connection to the existing sidewalk across the bridge over Crabtree Creek.

Project Status: Design Phase
Projected Completion: Spring 2020
Project Engineer - Cordis Yates-Thompson

Project Location