Lower Longview Stream Bank Repair

Last updated May 10, 2018 - 3:36 pm
  • Planning
  • Design
  • Construction
  • Completed
  • Stream Restoration
  • $200,000
  • Stormwater Management (Lead)
  • Brown and Caldwell, Inc.
  • River Works, Inc.

Current Activity

Posted Thursday, May 10

The construction contract for this stream restoration is being prepared. During this time, the City also will be getting necessary easements from property owners for this project. Construction is expected to start this spring.

Summary

The primary goal of this project is to repair 500 feet of eroded stream bank running north of New Bern Avenue at Longview Lake Drive. Repairs will include:

  • Introducing plants to the stream to provide stability;
  • Lowering the slopes above the normal flow line of the creek;
  • Extending a stormwater pipe that goes to the creek in order to prevent erosion in the future; and
  • Protecting the outlet of the stream.

Schedule

Project schedule with dates and descriptions
DateDescription
Fall 2017Project design complete
Spring 2018Project construction begins
Summer 2018Project construction complete

History

This project is associated with additional efforts to restore Lower Longview Lake Dam.