Old Wake Forest Road and Dixie Forest Road Widening Project

Last updated Mar. 09, 2018 - 5:09 pm
  • Planning
  • Design
  • Construction
  • Completed
  • Street Improvement Project
  • 4.8 Million
  • Roadway Design and Construction (Lead)
  • Wetherill Engineering, INC.

Current Activity

Posted March 9

Public Meeting

The City of Raleigh and our engineering design consultant, Wetherill Engineering, have completed the 25 percent preliminary design for the project and a meeting to show the details of the preliminary design and to receive comments from the community was held on Thursday, March 8.

For those interested in the project but unable to attend the meeting the public meeting presentation, project map, meeting handout, and comment form are linked below. For comments to be considered in the project design, the City requests that all comments are provided by March 23.

Project Map



Comment Sheet


The proposed improvements consist of widening Old Wake Forest Road and Dixie Forest Road between Capital Boulevard and Spring Forest Road. (US1). Roadway improvements will include:

  • Curb and gutter
  • Sidewalks on both sides of the roadway
  • Bicycle lanes
  • Streetlights
  • Landscaping
  • New railroad bridge


Project schedule with dates and descriptions
March 8, 2018Public Meeting - 25% Plan
Late Spring 2018Public Meeting - 65% Plan
Summer 2018Public Hearing
Spring 2019Complete Right of Way and Easement Acquisition
Spring 2019Advertise for Construction Contract
Late Spring 2019Award Construction Contract
Summer 2021Project Completion


The Old Wake Forest Road Widening Project was partially funded by the 2013 Transportation Bond referendum.