Juniper Street Stormwater Project

Last updated Oct. 03, 2017 - 1:33 pm
  • Planning
  • Design
  • Construction
  • Completed
  • Storm Drainage System
  • TBD
  • Stormwater Management (Lead)
  • Hazen and Sawyer

Current Activity

This project is currently in its planning phase and will be contracted with Hazen and Sawyer for the design portion of the project.

The Laurel Hills Area Stormwater Management Study provides more information about the watershed study that led to this project.

Summary

The purpose of this project is to address street flooding that is occurring on Juniper Street in the public right-of-way (areas that are considered public property). 

Schedule

Project schedule with dates and descriptions
DateDescription
Fall 2017Begin project planning (with project design and construction to follow after initial findings are determined)

History

The drainage issue on Juniper Street was identified as a project following findings from the Laurel Hills Drainage Area Study. The project was evaluated as a high priority project using the Stormwater Management Division's prioritization model, which ranks projects based on its severity and need to address the stormwater issue.